Introduction
Engineering Division of
Gillanders Arbuthnot & Co. Ltd.
known as 'MICCO' ,
originally set up in Kolkata in
the year 1957 as a steel work
fabrication and erection
company, has grown into a
leading EPC/Turnkey Constructing
company, executing turnkey
contracts all over India.
MICCO is a premier project
execution company involving
design, detail engineering,
manufacture and supply of
equipment, electrical,
instrumentation, erection,
commissioning and performance
tests in the field of Building &
Technological Structure, Tankage,
Piping, Blast Furnace,
Re-Heating Furnace, Industrial
Furnace, Cold Rolling Mill,
Continuous Casting Machine, Gas
holder, Coke Oven Battery
project, Raw Material Handling
etc.
Design & Drawing
MICCO's drawing office situated
at their registered office at
B1/3,Gillander House; 8,
N.S.Road, Kolkata-700001 is
fully computerized having latest
AUTO CADS,CAESER-II, STADDPRO,
Primavera Software, & engaged in
Design drawing work as well as
detail work for most of their
clients & consultants including
Dasturco, MECON, EIL, DCL, TPE,
CET, SAIL, Clayton Walker,
Bricmont, RAD-CON, Kuettner,
JSW,JSL, JSPL,BSL,BPSL,RINL etc.
LSTK / EPC Contracts
One of the core competences of
MICCO is in the area of LSTK and
EPC contracts. Here the
company's philosophy has been to
provide the customer not only
turnkey construction but also
turnkey solutions.
GAS HOLDER
MICCO is the exclusive Indian
Partner of M/s. Motherwell
Bridge Ltd., Clayton Walker Gas
Holder, U.K. the world leader
for all types of Gasholder
Technology. MICCO has executed a
numbers of Gasholder projects
during the last over 25 years.
These include engineering,
fabrication, erection, testing
and commissioning.
Project Executed
-
2 nos. 150,000 Cu.M. B.F.
Gasholders for Tata Steel
Ltd.-one each for their
Jamshedpur & Kalinganagar
Plant , which are the
largest Single Dry Seal
Gasholder of the world.
-
1 no. 100,000 Cu.M.Single
Dry Seal type LD Gasholder
for Tata SteelLtd,
Jamshedpur.
-
1 no. 100,000 Cu.M. Single
Dry Seal type Corex
Gasholder for JSW Ltd,
Bellary.
-
1 no.100,000 Cu.M.Single Dry
Seal type BF Gasholder for
Bhushan Steel Ltd.,Angul.
-
1 no.80,000 Cu.M. Double Dry
Seal type LD Gasholder for
Vizag Steel Plant.
-
4 nos .80,000 Cu.M. Single
Dry Seal type LD
Gasholders-one each for Tata
Steel Ltd,Jamshedpur &
Kalinganagar, Vizag Steel
Plant & JSPL ,Angul.
-
3 nos. 50,000 Cu.M. Single
Dry Seal type BF Gasholder 2
Nos. for JSW Ltd, Bellary &
1 no. for Bhushan Power &
Steel Ltd, Jharsuguda.
-
1 no. 50,000 Cu.M. Single
Dry Seal type LD Gasholder
for Rourkela Steel Plant.
-
1 no. 50,000 Cu.M. Single
Dry Seal type CO Gasholder
for Bhushan SteelLtd , Angul
-
1 no. Double Dry Seal type
LD Gasholder of 80,000 Cu.M.
for Vizag Steel Plant.
-
1 no. 100,000 Cu.M. MAN Oil
Seal type CO Gasholder for
Rourkela Steel Plant.
On Going Projects
Single Dry seal Gasholders under
Construction are
-
1 no.100,000 Cu.M. LD
Gasholder for Bhushan Steel
Ltd.,Angul. This is being
commissioned in record time
and before the scheduled
completion period.
-
3 nos. 80,000 Cu.M. Single
Dry Seal type LD Gasholder,
one each for Bhilai, Bokaro
& NMDC Steel Plant.
-
1 no. 60,000 Cu.M. LD
Gasholder for Tata Steel Ltd
,Jamshedpur. .
MICCO-MBL has also developed
special expertise for
repair/ revamping of
gasholders during short
shutdown periods.
-
This special expertise was
used for clients like
Durgapur Steel Plants, TATA
Steel and Visakhapatnam
Steel Plant for their 50,000
Cu. M. Tar Seal type CO
Gasholder, 50,000 Cu. M. Dry
Seal LD Gasholder & 80,000
Cu. M. Double Dry Seal
Gasholder respectively for
repair /revamping work and
conversion of 50,000 Cu. M.
Klonne Gasholder to 34,500
Cu. M. Single Dry Seal type
CO Gasholder.
MICCO-MBL has also developed
special expertise for safe &
methodical dismantling of old
existing/damaged Wiggins dry
seal type gasholder as well MAN
Oil/Tar Seal gasholders. They
have dismantled one 100,000 m3
MAN Oil seal type BF Gasholder
at Durgapur Steel Plant and one
each 80,000 m3 & 50,000 m3 dry
seal gasholders and one each
150,000 m3 & 50,000 m3 MAN oil/
tar seal gasholders for Tata
steel , Jamshedpur.
REHEATING FURNACE /
INDUSTRIAL FURNACE
MICCO is having total solution
for various furnaces and heating
system for steel rolling mills,
aluminium and copper industry as
well as for different heat
treatment and other heating
appliances.
MICCO has an exclusive Tie-up
with M/s. Andritz Metals Inc ,
Germany ( formerly Bricmont Inc.
USA) in the area of Reheating
Furnace like Walking Beam,
Walking Hearth, Pusher, Tunnel
and Roller Hearth etc. MICCO
also has association with M/s
RAD-CON Inc ,USA in the field of
Bell Type Annealing Furnaces. A
comprehensive list of projects
undertaken in this area are :
Design, Fabrication, Supply,
Erection, Testing &
Commissioning of Reheating
furnaces -
-
150 TPH Walking Beam type
Reheating Furnace for Rebar
Mill in Tata Steel Ltd,
Jamshedpur.
-
110 TPH Walking Beam type
Reheating Furnace for Billet
Mill in Durgapur Steel
Plant, Durgapur.
-
160 TPH Walking Beam type
Reheating Furnace for Bar
Mill in IISCO Steel Plant,
Burnpur.
-
180 TPH Walking Beam type
Reheating Furnace for
Universal Section Mill in
IISCO Steel Plant, Burnpur.
-
150 TPH Walking Beam type
Reheating Furnace for Wire
Rod Mill in IISCO Steel
Plant, Burnpur.
-
160 TPH Walking Beam type
Slab Reheating Furnace for
Stainless Steel Hot Strip
Mill in Bhuvee Profiles &
Stainless Pvt. Ltd., Angul.
-
220 TPH Walking Beam type
Reheating Furnace for Medium
Structural Mill in Durgapur
Steel Plant, Durgapur.
MICCO in association of M/s
Radcon Inc,USA & M/s Sunag
Engineering,Kolkata did the
Design, Fabrication, Supply,
Erection, Testing &
Commissioning of Hydrogen Bell
Annealing Furnace consisting of
47 Nos. Bases for New Cold
Rolling
Mill in Bokaro Steel Plant.
MICCO in association of Beijing
Shenwu successfully did the
Erection, Testing &
Commissioning of BF Gas operated
300
TPH Walking Beam Regenerative
type Reheating Furnace for Hot
Strip Mill in Tata Steel Ltd.,
Jamshedpur.
MICCO has also fabricated and
supplied different Technological
Structures for the following
furnaces:-
-
250 TPH Tunnel Furnace for
Bhusan Steel.
-
250 TPH Walking Beam Slab
Reheating Furnace for Tata
Steel Ltd. Jamshedpur.
-
300 TPH Walking Beam Slab
Reheating Furnace for Essar
Steel and Jindal Vijaynagar
Steel Ltd.
-
Two Nos. 300 TPH Walking
Beam Slab Reheating Furnace
for Bokaro Steel Plant,
Bokaro.
In the area of LADLE and other
furnace, MICCO has successfully
completed the following :
-
Fabrication and supply of
different mechanical
components of Electric
Furnace for G.A. Danieli,
Kolkata.
-
50T Electric Arc Furnace for
Llyod Steel.
-
Fabrication, Supply and
Erection of Shoe Pusher
Furnace Components for
Bharat Aluminium Company,
Korba.
-
Fabrication, Supply and
Erection of complete
continuous galvanising line
furnace of Tata Steel Ltd.-CGL#2.
Furnace For Non-Ferrous
Material.
Copper Smelting, settling and
converting furnace for Birla
Copper, Dahej including detailed
engineering fabrication and
erection. The technology was
provided by Ausmelt, Australia.
BLAST FURNACE
MICCO continues to be forerunner
in undertaking any Blast Furnace
project in India, from erection
of new ones to rebuilding or
relining existing ones.
Projects Executed :
-
RINL Visakhapatnam Steel
Plant ; BF-1 ; Category-1
Repair and Up gradation of
32,000 m3 to 38,000m3
capacity in
Association with Siemens VAI,
where MICCO also executed
the total Water System.
-
JSW-Bellery; BF-1 ;
Revamping & Up gradation
from 1209 m3 to 2503 m3
covering dismantling and
removal of
existing entire shell by
Strand jack arrangement,
erection of entire blast
Furnace, Dust Catcher, Slag
Granulation Plant, Top
Charging Equipment, Cast
House, Charging Conveyor
etc. in Module form in 90
Days shutdown period in the
year 2016.
-
Site fabrication of
structural & erection of
Structural and Equipment for
2015 m3 new Blast furnace at
Bhushan Power & Steel as per
Paul Wurth technology.
-
Assembly & Erection of 1008
m3 New Blast furnace at
Bhushan Power & Steel Ltd in
association of SSIT, China.
-
Rebuilding & Upgradation of
Blast Furnace no-3 of 1400
Cu. M. capacity by changing
the shell at Durgapur Steel
Plant done by MICCO in
record time in association
with Mecon. MICCO
fabricated, supplied,
erected & commissioned total
building structure &
technological structures
along with all mechanical
equipment, piping, cast
house, gas cleaning plant
,stove renovation,
ancillaries , material
handling etc.
-
Fabrication, supply,
erection, testing &
commissioning of 215 M3 new
Blast Furnace for Neo
Metalics as per Tata Korf
drawing.
-
Originally the 1600 m3
G-Blast furnace of Tata
Steel, Jamshedpur which came
in piece small from Portugal
was assembled & erected by
MICCO.
-
MICCO supplied over 5000 MT
technological structures for
Durgapur Steel Plant's Blast
Furnace No.4.
-
Fabrication & Erection of
Building & technological
Structure of BF auxiliaries,
Pig Casting M/c. Jn Houses,
Sinter Plant, ESP &
Equipment erection of 1681
M3 capacity Blast Furnace
for Bhushan Steel Ltd.
-
Upgradation of Tata Steel G-
Blast Furnace in the Stove
and Cooling Water System
Area. G- Blast Furnace Stove
Area Piping and Equipment
work including conversion of
all valves to Hydraulic
operation was done by MICCO.
-
Completed and upgraded new
Water System for Vizag Blast
Furnace -2 of 32,000 m3
Capacity upgraded to 38,000
m3.
-
Upgrading and Relining of E
Blast furnace of 1250 m3 at
Tata Steel, Jamshedpur in
2017.
PIPING
Piping is a critical thrust area
for MICCO in both above ground
and underground piping. MICCO
has expertise in CS, SS, AS, IBR
and Rubberised piping work.
Project Executed :
-
Refinery Piping at Digboi
for IOCL.
-
High Tensile Piping for
Vizag Steel Plant.
-
Coke Oven Gas Piping and
steam piping for Gas Mixing
Station for Tata Steel.
-
Skin Pass Mill, Hydraulic
and Lub Piping for Tata
Steel.
-
Hydraulic/Grease/Lub Piping
for HSM at Rourkela Steel
Plant.
-
CS/SS Piping for continuous
casting granule plant for
Stollberg Durgapur.
-
Overhead Yard Pipe Work for
1MTPA Expansion Project at
Tata Steel.
-
CS/SS Piping Work for Water
System of G Blast Furnace at
Tata Steel.
-
SMS 1 & II, LD Yard Piping
for JSW.
-
LD Piping for VSP, SMS II &
Bokaro Steel Plant SMS II
Gasholder Project.
-
LP Piping for Power Plant at
Bakreswar and Mejia.
-
Piping work for Slab Caster,
Bloom Caster, Billet Caster
at Tata Steel & Vizag Steel.
-
B.F. Gas duct work at Bokaro
Steel Plant.
-
BOF Gas duct work at Vizag,
Bokaro and Tata Steel Plant.
-
Total water system piping
for Capital repair of RINL
BF-1 & BF-2 Pump house of
Capital Repair of RINL
,BF-1&2.
-
Total Piping work of Capital
Repair of RINL BF-1, Tata
Steel "E" Blast furnace
-
External Water supply system
for Bloom Cum Round Caster
and LF#3 at SAIL Durgapur
steel plant.
STRUCTURAL STEEL WORK.
MICCO is an established leader
in structural steel work
fabrication and erection and
have executed more than 300,000
MT of work. Some of MICCOs major
works have been for different
core sectors like the Power,
Steel Copper, Aluminium, Paper
etc as below:
Power
Steel Plant
-
Raw Material Storage &
handling system for Sinter
Plant No.3 of Bhilai Steel
Plant - 9000 MT., CRM
Building for Tata Steel Ltd.
- 5000 MT., RMBBS Area, 6th
Lime Kiln, Coal Injection
System for Tata Steel Ltd. -
6300 MT., H.S.M. for Tata
Steel - 11,000 MT., LD-1
Building for Tata Steel -
13400 MT., Bokaro Steel
Plant - 22000 MT., Rourkela
Steel Plant - 16000 MT.,
Blast Furnace Structural for
DSP - 2500 MT., Bhushan
Steel Ltd. - 5000 MT.,
Bhushan Steel & Power Ltd. -
8000 MT, JSW-Bellary -12,500
MT.COBP RINL 1000 tonnes
Aluminium Plant
Export
-
Fabrication and supply of
Building Structural for CRM
Projects and Cement Plants
more than 18000 MT. to
Bangladesh, Nigeria, Zambia.
-
Fabrication & supply of
Building Structure for
Ferrochrome Projects more
than 2000 MT. to South
Africa.
CONTINUOUS CASTING MACHINE
Molten metal from Steel Melt
Shop is the feed material for
Continuous Casting of Billets,
Blooms and Rounds. These are
then sent to various Rolling
Mills for subsequent processing.
In technical association with
Danieli India & Danieli Italy,
MICCO has commissioned plant &
equipment like Roller Tables,
various structural steel work
and Piping System for water,
gas, compressed air, hydraulic
and grease system.
MICCO has erected & commissioned
the entire mechanical &
electrical equipment for the
following jobs:-
-
Continuous casting Machine
at Tata Steel , one four
strand Billet Caster
(supplied by Siemens VAI).
-
Six strand Billet-cum-Bloom
Caster for VSP - 3 nos.
-
Four strand Bloom-cum-Round
Caster for DSP - 1 no.
STRUCTURAL MILL
-
Structural Mill is a
non-flat Rolling Mill
designed for producing
Beams, Channels, Angles,
Flats, Squares and Rounds
which are most important
input for construction
industries.
-
The feed material to this
mill is Continuous Cast
Blooms which are reheated in
Reheating Furnace and rolled
in this mill.
-
MICCO as Consortium Partner
of Danieli India and Danieli
Italy and have successfully
executed the project for
supply of Structural Mill in
RINL Vizag Steel Plant where
M/s Micco have supplied
entire pipeline for water,
gas, hydraulics and
lubrication system and did
complete erection of
structural, mechanical and
electrical plant &
equipment.
BY-PRODUCT PLANT
Project Executed
-
40 TPH Evaporation Plant at
Bharat Aluminium Co.Ltd.
Korba, M.P.
-
Phenolic Sewerage Treatment
Plant, Bhilai Steel Plant.
-
Gas Producer Plant at Bharat
Refractories Bhilai.
-
Starch Solution Preparation
Plant at Stollberg,
Durgapur.
-
Equipment of By-Products &
Plant Utility Services for
COBP at Jindal Stainless
Ltd, Duburi.
-
Tar & Liquor separation
system with Decanter at
Sail- Durgapur Steel Plant.
COKE OVEN BATERY
Project Executed
-
Erection and commissioning
of Plant & Equipment,
Piping, Refractories etc.
for rebuilt of recovery type
C.O. Battery No. 10. at
ISSCO Steel Plant ,Burnpur,
West Bengal.
-
Erection and commissioning
of Plant & Equipment,
Piping, Refractories etc.
for rebuilt of recovery type
C.O. Battery No.2. at Sail
Durgapur Steel Plant.
-
Fabrication & erection of
piping , technological
structures & equipment for
Hooghly Met Coke
non-recovery type C.O.
Battery.
DEDUSTING PROJECTS
MICCO is the pioneer in the
field of Electrostatic
Precipitator assembly, fitting,
erection including all
structural, mechanical and
electrical work, testing and
commissioning. Some of MICCO' s
clients in this field are Tata
Steel, RINL, Sail Bokaro,
Bakreshwar TPS, Mejia TPS,
Sambalpur TPS etc.
DESULPHURISATION
The hot metal treatment for
desulphurisation takes place
before the hot metal is charged
to the basic oxygen furnace for
making liquid steel. With
requirement of stringent quality
steel, hot metal
desulphurisation before steel
making is gaining importance and
more and more steel plants are
adopting this process.
With technology supply from M/s.Kuettner
GmbH & Co.KG, Germany, MICCO has
executed three hot metal
Desulphurization Plants at LD
Shop-1 and LD Shop-2 of Tata
Steel Limited. Except few
critical equipment, the entire
supply was carried out
independently.
POWER DISTRIBUTION SYSTEM
-
MICCO is executing a project
at RINL- Visag Plant for
supply and services for
Power Distribution System
for Coke over 5 and By
Product project along with
Daniele India Ltd, as
consortium partner. This
project covers the design,
manufacturing, testing at
works, packing, supply,
storage and handling at
site, erection, testing,
relay setting/relay
coordination, commissioning,
including related civil and
structural design,
construction/modification
work and handing over in
"ready to switch on"
condition to the purchaser
of the integrated power
distribution system with all
the power distribution
equipment's & their
auxiliary facilities
required for Coke oven 5 and
its related Coal handling,
CDCP, Coke handling, By
Product plants and Power
evacuation of 14 MW Power
Plant Projects ( COBP 5
project )Of RINL-
Visakhapatnam Steel plant on
a turnkey basis .This is an
ongoing project and will be
commissioned in 2019, the
civil volume of this project
is 11000 cubic metre and
1000 tonnes of structures.
JSW Dolvi
MICCO has
started the project in the JSW Dolvi
plant for rolling, fabrication,
erection, alignment and
commissioning of cyclone and
auxiliary equipment.
CLIENTS
The Company has an impressive
record of completing EPC
projects in record time in no of
times and its rich clientele and
technology providers have always
reposed the faith and trust on
MICCO during the last 30 years .
Steel Plants
SAIL Plants - Durgapur, Bokaro,
Bhilai, Rourkela, Iisco, Salem.
RINL, Vizag Steel Plant.
Neelachal Ispat Nigam Ltd,
Jajpur.
Tata Steel Plant, Jamshedpur &
Kalinganagar.
JSW Plant, Bellary & Dolvi
Bhusan Steel Ltd, Angul.
Bhusan Power & Steel Ltd,
Jharsuguda
NMDC Steel Plant, Jagdalpur.
Jindal Steel & Power Ltd, Angul.
Non Ferrous
Balco, Nalco, Hindalco (Renukut),
Birla Copper (Dahej)
Power
BHEL,WBSEB
Others
HZL , HEC, DANIELI, OCL, L & T,
MECON, PRIMETALS, SMS.
COLLABORATION / TIE UP/
ASSOCIATION
Being always on the lookout for
the latest technology, MICCO has
associations / tie-ups with a
numbers of overseas technology
providers as-
-
Motherwell Bridge Ltd,
Clayton Walker Gasholders,
UK.
-
Andritz Metals Inc, India
and Austria
-
RadCon Inc, USA.
-
Primetals Technologies,
Austria, Germany & India.(
erstwhile Siemens VAI )
-
Danieli, Italy & India.
-
SMS, Germany & India.
-
TPE, India & Russia.
These associations have enhanced
MICCO's capability of upgrading
quality standards and minimizing
costs
QUALITY POLICY
We, at Gillanders Arbuthnot &
Co. Ltd: Unit- Modern India
Construction Company committed
to total Customer satisfaction
by providing Products & Services
which meet or exceed Customers
contractual expectations in term
of quality & time . Our Products
& Services should be a benchmark
& create a recommendation for
future business. All our
commitments, actions and
Products must be recognized as
an expression of quality. We
shall also stay focused
continuously and meet the
changing needs of the
industries. We shall imbibe a
better work culture in all
employees through systems. We
shall generate and sustain the
conviction in all employees and
management that intended Quality
has to be achieved and
continually improved.
This policy requires that all
people of GACL-MICCO be
committed to excellence and do
the work right- the first time
every time.
Our objective is to build
quality into operations to
ensure zero defect products and
services and to achieve
excellence in all endeavors and
have satisfied customer.
HEALTH , SAFETY & ENVIRONMENT
(HSE) POLICY
MICCO has committed to provide a
safe and healthy work place and
environment for all of our
staff, employees and our
Contractors' employees and
workmen to ensure the operations
being carried out in a manner
which protect the health,
environment and community in all
our running sites at Tata, RINL
, JSW, JSPL , SAIL , NMDC,
Bhushan Steel amongst others .
Philosophy
-
All accidents are
preventable.
-
No task is so important that
risk of injury to people or
damage to the environment is
justified.
-
HSE complied with all
applicable legislation
-
Identifying and
eliminating/controlling
hazards and pollution that
could cause accidents,
illness or environmental
harm by indicating HSE
procedures to the employees
and workmen who would aspire
to adopt the same standard
in all of their work.
-
Deputation of safety officer
at all the sites and
maintenance and studying of
safety manuals at the
running sites
-
Continuous training of
safety for the workmen and
officers engaged at site
through our safety officers.
|